Wednesday, 2 November 2016

Assignment 2: Production

Today we filmed our assignment. After changing roles I was in charge as camera operator. As camera operator it was my job to work closely with the director to ensure the shots were taken correctly that was initially set out as storyboards. While filming we took multiple shots at different angles and directions to portray the point of view of the actor.

Shots taken today included:

  1. The bathrooms in college
  2. The stairwell leading to 1B20
  3. The computers in 1B20
Once filming ended, as a group we sat down and watched the shots we took to ensure we have all the footage we need for editing. We have over 30 shots taken at this shoot and hope to edit the video this week also.

We did not meet any problems during production and we all enjoyed the day. 


No comments:

Post a Comment